Case Studies / Soil Stabilisation

Trench Excavation and Cabling to Provide Infrastructure Capability to Wind Turbines

As part of ongoing enabling and civils works with G2 energy on their wind turbine projects, Darlow Lloyd & Sons were carrying out a large amount of trench excavation into which G2 subsequently laid specialist earth cable into to assist with the electrical requirements of the turbines.

Case Studies / Soil Stabilisation

Enabling Construction of a Wind Turbine via Soil Stabilisation and an Access Road in Bridgend

G2 Energy were contracted by their client, a wind farm developer, to provide EPC services on a 500kW single wind turbine project in South Wales. The project involved upgrading existing access, installing new access, foundation works, substation construction and new HV cabling to the point of connection.

Case Studies / Soil Stabilisation

Enabling Construction of a Wind Turbine via Soil Stabilisation and an Access Road in Yorkshire

G2 Energy were contracted by their client, a wind farm developer, to provide EPC services on a handful of 500kW single wind turbine projects within the same locality in Yorkshire. The project involved upgrading existing access, installing new access, foundation works, substation construction and new HV cabling to the point of connection.